Quickie: 01/28/2008 6:18:49pm
Might as well replace the flush valve and flapper while the toilet is in pieces.
Might as well replace the flush valve and flapper while the toilet is in pieces.
AppleTV, audio/video switch, and RAID enclosure were all delivered today. I’m tempted to go play, but I really need to reassemble my bathroom. Besides, I know I’m going to need to make some cable purchases to set everything up properly.
3 hours at the dentist. Need I say more?
Only working a half day today. The rest of the day I’ll be in the dentist’s chair getting a root canal, crown prep, and implant crown prep. I think I’d rather work all day.
“Slept” in spare bedroom last night.
Saw IV was very confusing.
Watching golf. I wish I was playing.
Bathroom is done. Almost. Will put the toilet tank back on and clean the room tomorrow after paint is completely dry.
One coat of paint is done. Coat #2 later today. Time to snow blow the driveway and then make a trip to Home Depot.
Woke up with a headache. Must be from sniffing all the wallpaper glue yesterday. Painting gets done today.