Kitchen Remodel: All the “Small” Things

Six weeks ago I said progress would be slow going since I was back to work. I wasn’t wrong, but we’ve been knocking out odds and ends, mostly on weekends. Small changes can make a big difference and always seem to take two to three times as long as you’d expect.

I put in a bullnose on the stairs to the basement, we painted trim and the door, and rehung the door. Of course the door no longer fit after all the paint, so that turned in to a 2+ hour headache!

We painted the sides of the island to match the walls. Then painted trim and quarter round for the base and nailed it up. Our inspector Ninja had to approve the work.

I installed a banana hook under the cupboard, which folds up out of sight when not being used. The island got an IKEA towel rack and I replaced the outlet with a white one.

We did the trim around the sliding door, put in the floor transition pieces, and mounted a curtain rod.

We put a couple of floating shelves from Menards in the corner. I love the old recipe box Brandi found at an estate sale!

We patched up the old floor trim, cut new toe kicks under the cupboards, did all new quarter round, painted everything, and installed it around the entire room. The brown really is different; I call it “chocolate milk.”

There were ugly gaps around most of the cabinets, which really stood out with the new colors. We found some simple trim at Lowes, which was only $3.06 for eight foot lengths. Since the white is a close match there was no need for paint. It took me a bit to figure out how to deal with the odd face frame corners, but it turned out really nice and made a huge improvement. There are still a couple of pieces to install after the backsplash is done.

The trim around the big window had a similar problem at the edges. We decided to use the same stuff there. It really adds a decorative element with the triple color combination. This is all that could be done until the backsplash is finished.

It didn’t feel like we were making any progress at all over the last six weeks, but as I selected pictures for this post and started typing it really was a lot of small projects that add up. Now it’s time to work on the backsplash; the final step of the project and one we’ve been talking about since it all started. This weekend I’ll be mocking up test pieces and we’ll hopefully decide on the direction we’re going. Stay tuned!

2 thoughts on “Kitchen Remodel: All the “Small” Things

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s